New turnout requiring an additional mast
A motorized trolley platform for metre gauge is assisting the OLE works during the track renewal at Zentralbahn's Sarnen station.
New turnout requiring an additional mast
A motorized trolley platform for metre gauge is assisting the OLE works during the track renewal at Zentralbahn's Sarnen station.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Web CMS