ROCS, the rigid overhead conductor rail system, was fitted into the new tunnel at St-Pölten.
ROCS, the rigid overhead conductor rail system, was fitted into the new tunnel at St-Pölten.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Content Management Solutions