The depot in Innertkirchen is equipped with an overhead conductor rail. For works on the roofs of the vehicles, the mainteners can remove a 3 metres long piece of 3 m of the conductor bar themselves.
The depot in Innertkirchen is equipped with an overhead conductor rail. For works on the roofs of the vehicles, the mainteners can remove a 3 metres long piece of 3 m of the conductor bar themselves.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Website Content Management